Lumut Balai Unit 2 Geothermal Plant Location : Muara Enim, South Sumatera, Indonesia

Project Details

SYSTEM

Geosynthetic- EPGEO

PNB- Nets

TerraGreen, Armamat
Eco and Soil Nailing

OWNER

PT. Pertamina
Geothermal Energy

CONTRACTOR

PT. Wijaya Karya
(Persero) Tbk.

CONSTRUCTION YEAR

03/2024 to
06/2024

DESIGNER + CONSULTANT

  • Geoquest
    (Reinforced
    Earth Indonesia)

Background

First application of Erosion Control Blanket and Protective Net for hauling road development of Lumut Balai Unit 2 Geothermal Plant.

After massive cut and fill works in hauling road development, cut and fill slope shall be protected from surface erosion issue.

In addition, some high slopes shall be stabilised with soil nailing.

Challenge

Erosion Control Blanket has to be installed on slope with the height up to 50m.

Solution

ReCo and FTT work together to provide combination solution soil nail and ArmaMat Eco (combination of TerraGreen and Rectangular Net) to stabilise the slopes and yet provide green facing.

In this project, we are awarded for 2,525 m2 of ArmaMat Eco, 20,890 m2 of TerraGreen and 23,415 m2 of Hydroseeding works.

Share this project, choose your platform!

You want to contact an expert ?